PCL picked to build $2.1B replacement for St. Paul’s Hospital at new Vancouver site

Along with PCL, HDR Architecture Associates Inc. and Stantec Architecture Ltd. are included in the design-build team.  With financial close expected by the end of February, construction on the new hospital has been scheduled to start this summer. Work will last about five years. Providence Health said it expects to release more details once the construction contract is finalized, but pointed to late 2026 for completion.


Click here for the article by David Kennedy


PHOTO: Providence Health Care

Comments:
No comments

Post Your Comment:

The data relating to real estate on this website comes in part from the MLS® Reciprocity program of either the Real Estate Board of Greater Vancouver (REBGV), the Fraser Valley Real Estate Board (FVREB) or the Chilliwack and District Real Estate Board (CADREB). Real estate listings held by participating real estate firms are marked with the MLS® logo and detailed information about the listing includes the name of the listing agent. This representation is based in whole or part on data generated by either the REBGV, the FVREB or the CADREB which assumes no responsibility for its accuracy. The materials contained on this page may not be reproduced without the express written consent of either the REBGV, the FVREB or the CADREB.